Tanda Terima Pembayaran Upah Paving Blok Mallari (150x4,5-6 m) Tahun 2025
08 September 2026 12:41:20
1 Kali
Administrator
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Surat
Surat
Surat
Surat
Surat
Surat
Surat
Surat
Rp. 1.801.432.616,00Rp. 1.815.108.310,00
Rp. 1.528.427.536,00Rp. 1.569.709.500,00
Rp. 258.601.190,00Rp. 258.601.190,00
Rp. 12.916.310,00Rp. 12.916.310,00
Rp. 1.255.133.000,00Rp. 1.255.133.000,00
Rp. 49.543.000,00Rp. 63.521.000,00
Rp. 479.538.000,00Rp. 479.538.000,00
Rp. 4.302.306,00Rp. 4.000.000,00
Rp. 685.507.036,00Rp. 726.789.000,00
Rp. 649.335.140,00Rp. 649.335.140,00
Rp. 2.000.000,00Rp. 2.000.000,00
Rp. 90.785.360,00Rp. 90.785.360,00
Rp. 100.800.000,00Rp. 100.800.000,00